VIDEOS
Above: YouTubeCA video - Newcastle Trains & Trams, Before & After! - Length: 60:00 mins. | Above: YouTubeCA video - Newcastle Light Rail: Newcastle Interchange to Newcastle Beach - Length: 12:33 mins. |
PHOTO
MAP
I created the above map by overlaying an OpenStreetMap (OSM) map with my own data. Copyright on the OSM map is © OpenStreetMap contributors, licensed under a CC-BY-SA (Creative Commons Attribution-ShareAlike 2.0 licence).
Please note that the OSM map used as a template for this map corresponds to the situation at the time the map was downloaded and may show features that did not exist at the time the GS Tram Site is supposed to show. In particular, it may show bridges and highways that were built later.
LIGHT RAIL (TRAM) ROUTE
Operator: Newcastle Transport
L | LRT | Newcastle Interchange - Honeysuckle - Civic - Newcastle Beach |
CHARACTERISTICS OF THE SYSTEM
NETWORK LENGTH
- Light Rail (Tram) line: 2.7 km.
HISTORY
- Steam trams: 6 July 1887 - 1 Nov. 1930
- Electric trams (1st generation): Oct. 1923 - 11 June 1950
- Light rail: 18 Feb. 2019 - today.
GAUGE
- 1st generation steam and electric tramways: ?
- LRT: 1435 mm.
SOURCES
- "NSW's Newcastle tramway opens ahead of schedule" Tramways & Urban Transit, Apr. 2019 (82: 976), p.125.
- "Sun, sand and light rail" Tramways & Urban Transit, Apr. 2018 (81: 964), p.138-139.
WIKIS
WEB SITES
Copyright Gabor Sandi 1998-2024
Disclaimer: Everything on this site was written and/or prepared at the author's discretion. The author has tried to be accurate where facts are presented, but this does not mean that these facts are necessarily accurate. People needing more reliable information should refer to appropriate sources presented, on the Internet or elsewhere, by authoritative professional or academic bodies.
To get in touch with the webmaster, send an e-mail to g_sandi at hotmail.com.
Flags on this site are from the FOTW Flags Of The World website.